性爱无码高清电影|亚洲第一播放器|国产精品日日摸夜夜摸添孕妇|日本在线不卡免费|日韩A片大全在线观看|国产精品Av在线观看|欧美日韩另类一级二级|国产一区二区三区高清无码|成人网站在线观看视频|TS女神第一福利视频


Nearly 90% of the steel structure of the plant has been completed, and the Xiangshui 1 million tons stainless bar and wire project has been fully resumed

  • Friday, February 26, 2021
  • Source:ferro-alloys.com

  • Keywords:Tengkai metal new material,stainless steel
[Fellow]The total investment of tengkai metal new material project is 1.15 billion yuan. After all of them are put into operation, the annual output of stainless steel wire coil and small stainless steel bar can reach 300000 tons and 700000 tons respectively.

[Ferro-Alloys.com]

  According to Ju Longqing, the production director of Xiangshui Jiangsu tengkai new metal materials project, the steel structure of the plant has been completed nearly 90%, and it is expected to be completed in one month. All the key construction projects are scheduled to be carried out 24 hours a day in two shifts. According to the plan, the infrastructure construction and equipment installation will be completed in June, and the commissioning phase will begin.

  The total investment of Tengkai metal new material project is 1.15 billion yuan. After all of them are put into operation, the annual output of stainless steel wire coil and small stainless steel bar can reach 300000 tons and 700000 tons respectively.

  • [Editor:Catherine Ren]

Tell Us What You Think

please login!   login   register
Please be logged in to comment!