性爱无码高清电影|亚洲第一播放器|国产精品日日摸夜夜摸添孕妇|日本在线不卡免费|日韩A片大全在线观看|国产精品Av在线观看|欧美日韩另类一级二级|国产一区二区三区高清无码|成人网站在线观看视频|TS女神第一福利视频


Belarus NPP Power Unit Put into Commercial Operation

  • Tuesday, June 22, 2021
  • Source:ferro-alloys.com

  • Keywords:NPP,power,Belarus
[Fellow]On June 10, 2021, the acceptance certificate of Belarus NPP power unit No 1 start-up complex was signed.

[Ferro-Alloys.com]On June 10, 2021, the acceptance certificate of Belarus NPP power unit No 1 start-up complex was signed. Handover of the power unit was held in accordance with contractual obligations for BelNPP construction and the legislation of the Republic of Belarus. Pursuant to the Contract, the General Contractor is responsible for performance capability of the power unit equipment during the warranty obligations period.

The stage of Belarus NPP power unit No 1 physical start-up started on August 7, 2020, on November 3 the unit was connected to the grid of the Republic of Belarus and on December 22, 2020 - proceeded to the trial commercial operation. On June 2, 2021, the Board of the Ministry for Emergency situations of the Republic of Belarus issued the permit for commercial operation of the power unit.
 
Belarus NPP having two VVER-1200 reactors with the total capacity of 2400 MW is being constructed in Ostrovets (the Republic of Belarus). The Russian III+ generation design that is fully compliant with the international standards and the International Atomic Energy Agency (IAEA) safety recommendations has been selected for the first NPP in Belarus. Currently, four power units of the similar type are being successfully operated in Russia: at the Novovoronezh and the Leningrad NPP.
 
source:SteelGuru Business News
  • [Editor:李慧]

Tell Us What You Think

please login!   login   register
Please be logged in to comment!