性爱无码高清电影|亚洲第一播放器|国产精品日日摸夜夜摸添孕妇|日本在线不卡免费|日韩A片大全在线观看|国产精品Av在线观看|欧美日韩另类一级二级|国产一区二区三区高清无码|成人网站在线观看视频|TS女神第一福利视频


Element 25 on track with manganese production expansion after study outlines strong case

  • Wednesday, January 24, 2024
  • Source:ferro-alloys.com

  • Keywords:market, mining industry,mine,steel,iron ore,
[Fellow]Element 25 Ltd (ASX:E25, OTCQX:ELMTF) has completed a comprehensive feasibility study (FS) to expand manganese production at its Butcherbird Project

【Ferro-alloys.com】:Element 25 Ltd (ASX:E25, OTCQX:ELMTF) has completed a comprehensive feasibility study (FS) to expand manganese production at its Butcherbird Project in Western Australia with positive outcomes providing a strong case to proceed.

Enhanced production

The expansion promises enhanced production capabilities, economic benefits and alignment with evolving market demands, particularly in the EV sector, while aligning with the company’s commitment to sustainable and responsible mining practices.

E25's study, which concluded this month, evaluates the feasibility of increasing manganese concentrate production to 1.1 million tonnes per annum to leverage economies of scale.

The expansion strategy involves enhanced open-cut mining methods, a modified comminution circuit and the integration of a dense media separation (DMS) back-end solution to optimise grade and recoveries.

Projected annual cash flow from the expanded operation is A$57.3 million, with low capital requirements of A$49.8 million.
 

  • [Editor:Alakay]

Tell Us What You Think

please login!   login   register
Please be logged in to comment!